2nd ICAI 2022
International Conference on Automotive Industry 2022
Mladá Boleslav, Czech Republic
References [1] Achanga, P., Shehab, E., Roy, R. and Nelder, G. (2006). “Critical success factors for lean implementation within SMEs”, Journal of Manufacturing Technology Management , Vol. 17 No. 4, pp. 460–471. https://doi.org/10.1108/17410380 610662889 [2] Adizes, I. 1979. Organizational passages: diagnosing and treating life cycle problems in organizations. Organizational Dynamics , Vol. 8, No. 1, pp. 3–24. [3] Al-Najem, M., Dhakal, H., and Bennett, N. (2012). The role of culture and leadership in lean transformation: a review and assessment model. International Journal of Lean Thinking, 3(1), 119–138. [4] Angelis, J., Conti, R., Cooper, C., and Gill, C. (2011). Building a high‐commitment lean culture. Journal of Manufacturing Technology Management . [5] Dahlgaard, J.J. and Mi Dahlgaard‐Park, S. (2006), “Lean production, six sigma quality, TQM and company culture”, The TQMMagazine , Vol. 18 No. 3, pp. 263– 281. https://doi.org/10.1108/09544780610659998 [6] Dickinson, V. (2011). Cash Flow Patterns as a Proxy for Firm Life Cycle. The Accounting Review, Vol. 86, Iss. 6, pp. 1969–1994. https://doi.org/10.2308/accr 10130. [7] Doolen,T. L., andHacker,M. E. (2005). A reviewof lean assessment inorganizations: an exploratory studyof leanpractices by electronicsmanufacturers. Journal ofManufacturing systems , 24(1), 55–67. https://doi.org/10.1016/S0278-6125(05)80007-X [8] Dorval, M., Jobin, M.-H. and Benomar, N. (2019). “Lean culture: a comprehensive systematic literature review”, International Journal of Productivity and Performance Management, Vol. 68 No. 5, pp. 920–937. https://doi.org/10.1108/ IJPPM-03-2018-0087 [9] Elkhairi, A., Fedouaki, F., and El Alami, S. (2019). Barriers and critical success factors for implementing lean manufacturing in SMEs. IFAC-PapersOnLine , 52(13), 565– 570. https://doi.org/10.1016/j.ifacol.2019.11.303 [10] Lester, D., Parnell, J. A., and Carraher, S. (2003). Organizational life cycle: A five stage empirical scale. International Journal of Organizational Analysis, Vol. 11, No . 4, pp. 339–354. https://doi.org/10.1108/eb028979. [11] Liker, J. (2004). The Toyota Way: 14 Management Principles from the World’s Greatest Manufacturer . New York, NY: McGraw-Hill. [12] Marodin, G. A., Frank, A. G., Tortorella, G. L., and Saurin, T. A. (2016). Contextual factors and lean production implementation in the Brazilian automotive supply chain. Supply Chain Management: An International Journal . https://doi.org/10.1108/ SCM-05-2015-0170 [13] Miller, D., and Friesen, P. H. (1984). A longitudinal study of the corporate life cycle. Management science, Vol. 30, No. 10, pp. 1161–1183. http://dx.doi.org/10.1287/ mnsc.30.10.1161.
244
Made with FlippingBook Ebook Creator